With the recent power outage woes being experienced by Summerstrand residents for an an extended length of time due to vandalism on an ancient oil filled 132 KvA cable, along with an extended overcast and rainy period we pulled out some data from a recent Solar installation installation done by Straton Solar.
The site has the following installed:
- Tesla 14 kWh Powerwall
- 6 kW Solar Edge Inverter
- 20 x 365w Tier 1 Solar Panels
- 20 x Solar Edge Optimisers
The installation is on a prepaid meter (awaiting a four quadrant meter installation) so is NOT pushing back into the grid, yet.
The normal maximum amount of discharge for this installation was initially set at 60%.
The graph above demonstrates the performance:
The mains power dropped out on 7 November 2021 at around 08:00
The mains power came on at 21:55 on 8 November and dropped at 23:59 on the same night.
The mains power came on at 13:56 on 9 November.
On 7 November in the space of 4 hours the Solar Panels charged the Tesla Powerwall to a 98.3% capacity from 42.3% capacity.
The picture on Monday with the rainy and overcast conditions was poor as the Solar Panels struggled to charge the Powerwall.
On Tuesday the picture changed dramatically with a typically sunny day and the Powerwall was charged to 98.9% capacity off of a base of 9.75% over a period of 6 hours.
The rate of charge by the Solar Edge Inverter is 5kW whilst the rate of charge from Mains power is 1.7 kW.
This particular installation is a very power hungry one and in order to mitigate the 4.6 hours that the installation had with NO POWER on the early morning of 9 November from 03:12 to 07:59 (mainly due to the inclement weather on Monday) the client would have to reduce consumption or install one more Powerwall.
“The beauty of the combination of Solar Edge and Tesla Powerwall combination is that the system worls seamlessly and allows us to remotely change settings for the client in times of need,” says Alan Straton of Straton Solar.
NOTE: This installation is a HYBRID installation and not OFF-GRID, making the performance far more notable.
Video: Real World Report – Tesla and Solar Edge Installation Under Stress
https://youtu.be/CNTSSagaKZE
More Info on Real World Report – Tesla and Solar Edge Installation Under Stress here: https://straton.co.za/solar/contact
Twitter: https://twitter.com/MyPE
Facebook: https://www.facebook.com/StratonSolar
CLICK HERE to submit your press release to MyPR.co.za.
Track Your Press Release HERE:
Check Online Visibility
Verify where this release is currently indexed:


Get ready for a bumper summer season in KZN’s Paradise